Check out these projects too
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Construction of a preparation room with a structure providing access to the roof.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Realization of a fully finished washing room with sliding panel at the front.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Project documentation of a renovation, with a before and after view of the building.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Installation of a complex cluster of stainless steel tube connections.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Modification and optimization of existing stainless steel pipes.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Design and installation of a bridge structure above a moving can conveyor line.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Design and production of custom-made stainless steel dump hoppers.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Installation of internal walls to create separate office spaces.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Realization of a platform that was suspended from an existing structure.
- Execution of floor works in which the floor was adjusted and extended from below.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Installation of automatic valves that open and close during the filling process.