Check out these projects too
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Construction of a platform to support a heat curtain and drying unit.
- Installation of a compressed air collector in galvanized steel.
- Construction of a preparation room with a structure providing access to the roof.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Execution of floor works in which the floor was adjusted and extended from below.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Installation of automatic valves that open and close during the filling process.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Realization of a fully finished washing room with sliding panel at the front.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Realization of a platform that was suspended from an existing structure.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Design and installation of a bridge structure above a moving can conveyor line.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Construction of a stainless steel fitting, made fully food-safe.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Installation of stainless steel pipes at a height of approximately 25 meters.