Check out these projects too
- Design and installation of a bridge structure above a moving can conveyor line.
- Construction of a preparation room with a structure providing access to the roof.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Construction of a platform to support a heat curtain and drying unit.
- Execution of floor works in which the floor was adjusted and extended from below.
- Installation of stainless steel piping with fully controlled valves.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Project documentation of a renovation, with a before and after view of the building.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Installation of a spiral duct for extraction via the roof.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Realization of a laboratory space constructed from sandwich panels.
- Modification and optimization of existing stainless steel pipes.
- Construction of a stainless steel fitting, made fully food-safe.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Stainless steel piping installed for product transport.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Installation of a stainless steel extraction pipe for dust extraction.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.