Check out these projects too
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Installation of a spiral duct for extraction via the roof.
- Realization of a laboratory space constructed from sandwich panels.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Project documentation of a renovation, with a before and after view of the building.
- Construction of a platform to support a heat curtain and drying unit.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Modification and optimization of existing stainless steel pipes.
- Installation of a stainless steel extraction pipe for dust extraction.
- Installation of stainless steel piping with fully controlled valves.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Installation of a compressed air collector in galvanized steel.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Execution of floor works in which the floor was adjusted and extended from below.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Construction of a stainless steel fitting, made fully food-safe.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Stainless steel piping installed for product transport.
- Design and production of custom-made stainless steel dump hoppers.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.