Check out these projects too
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Installation of a complex cluster of stainless steel tube connections.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Realization of a fully finished washing room with sliding panel at the front.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Construction of a platform to support a heat curtain and drying unit.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Realization of a laboratory space constructed from sandwich panels.
- Construction of a stainless steel fitting, made fully food-safe.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Design and production of custom-made stainless steel dump hoppers.
- Project documentation of a renovation, with a before and after view of the building.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Modification and optimization of existing stainless steel pipes.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Execution of floor works in which the floor was adjusted and extended from below.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Installation of a spiral duct for extraction via the roof.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.