Check out these projects too
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Construction of a preparation room with a structure providing access to the roof.
- Design and installation of a bridge structure above a moving can conveyor line.
- Execution of floor works in which the floor was adjusted and extended from below.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Project documentation of a renovation, with a before and after view of the building.
- Modification and optimization of existing stainless steel pipes.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Installation of a compressed air collector in galvanized steel.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Installation of stainless steel piping with fully controlled valves.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Installation of automatic valves that open and close during the filling process.
- Installation of a stainless steel extraction pipe for dust extraction.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Realization of a laboratory space constructed from sandwich panels.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Design and production of custom-made stainless steel dump hoppers.
- Realization of a platform that was suspended from an existing structure.