- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Installation of internal walls to create separate office spaces.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Stainless steel piping installed for product transport.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Installation of a stainless steel extraction pipe for dust extraction.
- Construction of a stainless steel fitting, made fully food-safe.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Modification and optimization of existing stainless steel pipes.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Installation of a compressed air collector in galvanized steel.
- Realization of a fully finished washing room with sliding panel at the front.
- Installation of stainless steel piping with fully controlled valves.
- Realization of a laboratory space constructed from sandwich panels.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Realization of a platform that was suspended from an existing structure.
- Installation of a complex cluster of stainless steel tube connections.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Design and production of custom-made stainless steel dump hoppers.
- Execution of floor works in which the floor was adjusted and extended from below.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- A fixed panel was replaced with a hinged panel for improved accessibility.