- Execution of floor works in which the floor was adjusted and extended from below.
- Installation of internal walls to create separate office spaces.
- Realization of a fully finished washing room with sliding panel at the front.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Construction of a platform to support a heat curtain and drying unit.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Stainless steel piping installed for product transport.
- Installation of stainless steel piping with fully controlled valves.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Installation of a complex cluster of stainless steel tube connections.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Installation of a compressed air collector in galvanized steel.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Modification and optimization of existing stainless steel pipes.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Realization of a laboratory space constructed from sandwich panels.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Installation of a stainless steel extraction pipe for dust extraction.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Construction of a stainless steel fitting, made fully food-safe.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Design and production of custom-made stainless steel dump hoppers.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.