- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Installation of a spiral duct for extraction via the roof.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Installation of a stainless steel extraction pipe for dust extraction.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Execution of floor works in which the floor was adjusted and extended from below.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Installation of automatic valves that open and close during the filling process.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Project documentation of a renovation, with a before and after view of the building.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Realization of a laboratory space constructed from sandwich panels.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Installation of a compressed air collector in galvanized steel.
- Construction of a platform to support a heat curtain and drying unit.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Installation of stainless steel piping with fully controlled valves.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.