- Installation of stainless steel pipes at a height of approximately 25 meters.
- Installation of stainless steel piping with fully controlled valves.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Construction of a stainless steel fitting, made fully food-safe.
- Realization of a laboratory space constructed from sandwich panels.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Design and production of custom-made stainless steel dump hoppers.
- Construction of a platform to support a heat curtain and drying unit.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Installation of a spiral duct for extraction via the roof.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Installation of a complex cluster of stainless steel tube connections.
- Project documentation of a renovation, with a before and after view of the building.
- Installation of automatic valves that open and close during the filling process.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Design and installation of a bridge structure above a moving can conveyor line.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Installation of a compressed air collector in galvanized steel.
- Stainless steel piping installed for product transport.
- Construction of a preparation room with a structure providing access to the roof.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Installation of internal walls to create separate office spaces.
- Realization of a platform that was suspended from an existing structure.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.