- Installation of a spiral duct for extraction via the roof.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Realization of a platform that was suspended from an existing structure.
- Design and installation of a bridge structure above a moving can conveyor line.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Project documentation of a renovation, with a before and after view of the building.
- Stainless steel piping installed for product transport.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Installation of a stainless steel extraction pipe for dust extraction.
- Installation of stainless steel piping with fully controlled valves.
- Installation of a complex cluster of stainless steel tube connections.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Design and production of custom-made stainless steel dump hoppers.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Installation of a compressed air collector in galvanized steel.
- Construction of a preparation room with a structure providing access to the roof.
- Construction of a stainless steel fitting, made fully food-safe.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Realization of a fully finished washing room with sliding panel at the front.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Installation of automatic valves that open and close during the filling process.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Execution of floor works in which the floor was adjusted and extended from below.