Check out these projects too
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Realization of a fully finished washing room with sliding panel at the front.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Installation of automatic valves that open and close during the filling process.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Construction of a stainless steel fitting, made fully food-safe.
- Realization of a laboratory space constructed from sandwich panels.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Realization of a platform that was suspended from an existing structure.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Installation of a compressed air collector in galvanized steel.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Installation of a stainless steel extraction pipe for dust extraction.
- Installation of stainless steel piping with fully controlled valves.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.