Check out these projects too
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Installation of a stainless steel extraction pipe for dust extraction.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Realization of a laboratory space constructed from sandwich panels.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Execution of floor works in which the floor was adjusted and extended from below.
- Installation of internal walls to create separate office spaces.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Installation of stainless steel piping with fully controlled valves.
- Design and installation of a bridge structure above a moving can conveyor line.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Construction of a preparation room with a structure providing access to the roof.
- Installation of a spiral duct for extraction via the roof.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Design and production of custom-made stainless steel dump hoppers.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Project documentation of a renovation, with a before and after view of the building.