Check out these projects too
- Design and production of custom-made stainless steel dump hoppers.
- Installation of a spiral duct for extraction via the roof.
- Design and installation of a bridge structure above a moving can conveyor line.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Construction of a stainless steel fitting, made fully food-safe.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Installation of stainless steel piping with fully controlled valves.
- Execution of floor works in which the floor was adjusted and extended from below.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Installation of internal walls to create separate office spaces.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Construction of a platform to support a heat curtain and drying unit.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Modification and optimization of existing stainless steel pipes.
- Installation of a compressed air collector in galvanized steel.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Stainless steel piping installed for product transport.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.