Check out these projects too
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Construction of a platform to support a heat curtain and drying unit.
- Installation of automatic valves that open and close during the filling process.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Design and production of custom-made stainless steel dump hoppers.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Execution of floor works in which the floor was adjusted and extended from below.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Realization of a fully finished washing room with sliding panel at the front.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Installation of internal walls to create separate office spaces.
- Installation of stainless steel piping with fully controlled valves.
- Modification and optimization of existing stainless steel pipes.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Realization of a platform that was suspended from an existing structure.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Stainless steel piping installed for product transport.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Installation of a complex cluster of stainless steel tube connections.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Project documentation of a renovation, with a before and after view of the building.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.