Check out these projects too
- Installation of internal walls to create separate office spaces.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Modification and optimization of existing stainless steel pipes.
- Installation of a complex cluster of stainless steel tube connections.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Execution of floor works in which the floor was adjusted and extended from below.
- Installation of a stainless steel extraction pipe for dust extraction.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Installation of stainless steel piping with fully controlled valves.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Realization of a laboratory space constructed from sandwich panels.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Construction of a stainless steel fitting, made fully food-safe.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Construction of a platform to support a heat curtain and drying unit.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Realization of a platform that was suspended from an existing structure.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Construction of a preparation room with a structure providing access to the roof.
- Realization of a fully finished washing room with sliding panel at the front.