Check out these projects too
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Construction of a stainless steel fitting, made fully food-safe.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Design and installation of a bridge structure above a moving can conveyor line.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Installation of a stainless steel extraction pipe for dust extraction.
- Construction of a preparation room with a structure providing access to the roof.
- Installation of a compressed air collector in galvanized steel.
- Installation of a spiral duct for extraction via the roof.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Project documentation of a renovation, with a before and after view of the building.
- Stainless steel piping installed for product transport.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Realization of a fully finished washing room with sliding panel at the front.
- Execution of floor works in which the floor was adjusted and extended from below.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Modification and optimization of existing stainless steel pipes.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Design and production of custom-made stainless steel dump hoppers.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.