Check out these projects too
- Installation of internal walls to create separate office spaces.
- Installation of a compressed air collector in galvanized steel.
- Execution of floor works in which the floor was adjusted and extended from below.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Installation of a spiral duct for extraction via the roof.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Installation of a stainless steel extraction pipe for dust extraction.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Project documentation of a renovation, with a before and after view of the building.
- Construction of a stainless steel fitting, made fully food-safe.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Installation of a complex cluster of stainless steel tube connections.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Installation of automatic valves that open and close during the filling process.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Stainless steel piping installed for product transport.
- Realization of a laboratory space constructed from sandwich panels.
- Design and installation of a bridge structure above a moving can conveyor line.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Installation of stainless steel piping with fully controlled valves.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.