Check out these projects too
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Construction of a wall that separates spaces and is provided with windows and doors.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Construction of a stainless steel fitting, made fully food-safe.
- Installation of a spiral duct for extraction via the roof.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Installation of a stainless steel extraction pipe for dust extraction.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Installation of internal walls to create separate office spaces.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Design and production of custom-made stainless steel dump hoppers.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Execution of floor works in which the floor was adjusted and extended from below.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Modification and optimization of existing stainless steel pipes.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Project documentation of a renovation, with a before and after view of the building.
- Construction of a platform to support a heat curtain and drying unit.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Design and installation of a bridge structure above a moving can conveyor line.