- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Construction of a preparation room with a structure providing access to the roof.
- Stainless steel piping installed for product transport.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Realization of a laboratory space constructed from sandwich panels.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Design and installation of a bridge structure above a moving can conveyor line.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Realization of a platform that was suspended from an existing structure.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Installation of internal walls to create separate office spaces.
- Installation of stainless steel piping with fully controlled valves.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.