Check out these projects too
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Construction of a platform to support a heat curtain and drying unit.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Modification and optimization of existing stainless steel pipes.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Design and production of custom-made stainless steel dump hoppers.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Project documentation of a renovation, with a before and after view of the building.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Installation of a spiral duct for extraction via the roof.
- Stainless steel piping installed for product transport.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Realization of a fully finished washing room with sliding panel at the front.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Installation of internal walls to create separate office spaces.
- Installation of a stainless steel extraction pipe for dust extraction.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Installation of a compressed air collector in galvanized steel.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Installation of sound and heat shielding around pumps to reduce nuisance.