Check out these projects too
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Installation of internal walls to create separate office spaces.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Project documentation of a renovation, with a before and after view of the building.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Installation of a complex cluster of stainless steel tube connections.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Design and installation of a bridge structure above a moving can conveyor line.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Design and production of custom-made stainless steel dump hoppers.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Execution of floor works in which the floor was adjusted and extended from below.
- Construction of a platform to support a heat curtain and drying unit.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Construction of a preparation room with a structure providing access to the roof.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Installation of stainless steel piping with fully controlled valves.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Stainless steel piping installed for product transport.
- Construction of a stainless steel fitting, made fully food-safe.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Modification and optimization of existing stainless steel pipes.