- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Construction of a stainless steel fitting, made fully food-safe.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Installation of a complex cluster of stainless steel tube connections.
- Design and installation of a bridge structure above a moving can conveyor line.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Installation of internal walls to create separate office spaces.
- Installation of a spiral duct for extraction via the roof.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Realization of a laboratory space constructed from sandwich panels.
- Installation of a stainless steel extraction pipe for dust extraction.
- Installation of stainless steel piping with fully controlled valves.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Installation of a compressed air collector in galvanized steel.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Execution of floor works in which the floor was adjusted and extended from below.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Modification and optimization of existing stainless steel pipes.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.