- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Project documentation of a renovation, with a before and after view of the building.
- Realization of a platform that was suspended from an existing structure.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Installation of a complex cluster of stainless steel tube connections.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Installation of a stainless steel extraction pipe for dust extraction.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Construction of a stainless steel fitting, made fully food-safe.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Installation of a spiral duct for extraction via the roof.
- Design and installation of a bridge structure above a moving can conveyor line.
- Installation of stainless steel piping with fully controlled valves.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Modification and optimization of existing stainless steel pipes.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Installation of internal walls to create separate office spaces.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Stainless steel piping installed for product transport.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.