Check out these projects too
- Installation of a complex cluster of stainless steel tube connections.
- Installation of stainless steel piping with fully controlled valves.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Design and installation of a bridge structure above a moving can conveyor line.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Stainless steel piping installed for product transport.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Realization of a laboratory space constructed from sandwich panels.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Installation of a compressed air collector in galvanized steel.
- Realization of a fully finished washing room with sliding panel at the front.
- Construction of a wall that separates spaces and is provided with windows and doors.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Installation of automatic valves that open and close during the filling process.
- Installation of internal walls to create separate office spaces.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Execution of floor works in which the floor was adjusted and extended from below.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Design and production of custom-made stainless steel dump hoppers.