- A fixed panel was replaced with a hinged panel for improved accessibility.
- Realization of a fully finished washing room with sliding panel at the front.
- Installation of a stainless steel extraction pipe for dust extraction.
- Construction of a platform to support a heat curtain and drying unit.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Realization of a laboratory space constructed from sandwich panels.
- Stainless steel piping installed for product transport.
- Installation of internal walls to create separate office spaces.
- Installation of a spiral duct for extraction via the roof.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Installation of a complex cluster of stainless steel tube connections.
- Execution of floor works in which the floor was adjusted and extended from below.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Design and installation of a bridge structure above a moving can conveyor line.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Installation of a compressed air collector in galvanized steel.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Project documentation of a renovation, with a before and after view of the building.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Construction of a stainless steel fitting, made fully food-safe.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Construction of a wall that separates spaces and is provided with windows and doors.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.