Check out these projects too
- Installation of stainless steel piping with fully controlled valves.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Installation of a complex cluster of stainless steel tube connections.
- Installation of internal walls to create separate office spaces.
- Construction of a preparation room with a structure providing access to the roof.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Design and installation of a bridge structure above a moving can conveyor line.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Execution of floor works in which the floor was adjusted and extended from below.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Design and production of custom-made stainless steel dump hoppers.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Construction of a stainless steel fitting, made fully food-safe.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- A fixed panel was replaced with a hinged panel for improved accessibility.