- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Realization of a platform that was suspended from an existing structure.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Realization of a fully finished washing room with sliding panel at the front.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Installation of automatic valves that open and close during the filling process.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Stainless steel piping installed for product transport.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Construction of a preparation room with a structure providing access to the roof.
- Installation of a complex cluster of stainless steel tube connections.
- Installation of a compressed air collector in galvanized steel.
- Realization of a laboratory space constructed from sandwich panels.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Construction of a platform to support a heat curtain and drying unit.
- Installation of internal walls to create separate office spaces.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Design and installation of a bridge structure above a moving can conveyor line.