Check out these projects too
- Modification and optimization of existing stainless steel pipes.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Construction of a preparation room with a structure providing access to the roof.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Design and installation of a bridge structure above a moving can conveyor line.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Realization of a laboratory space constructed from sandwich panels.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Execution of floor works in which the floor was adjusted and extended from below.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Stainless steel piping installed for product transport.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Construction of a stainless steel fitting, made fully food-safe.
- Realization of a fully finished washing room with sliding panel at the front.
- Installation of a stainless steel extraction pipe for dust extraction.
- Installation of automatic valves that open and close during the filling process.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Installation of a compressed air collector in galvanized steel.