Check out these projects too
- Design and installation of a bridge structure above a moving can conveyor line.
- Modification and optimization of existing stainless steel pipes.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Installation of internal walls to create separate office spaces.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Realization of a platform that was suspended from an existing structure.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Installation of automatic valves that open and close during the filling process.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Realization of a fully finished washing room with sliding panel at the front.
- Project documentation of a renovation, with a before and after view of the building.
- Design and production of custom-made stainless steel dump hoppers.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Installation of a stainless steel extraction pipe for dust extraction.
- Installation of stainless steel piping with fully controlled valves.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Installation of a complex cluster of stainless steel tube connections.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Execution of floor works in which the floor was adjusted and extended from below.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Installation of a spiral duct for extraction via the roof.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.