Check out these projects too
- Construction of a wall that separates spaces and is provided with windows and doors.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Installation of a compressed air collector in galvanized steel.
- Stainless steel piping installed for product transport.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Construction of a preparation room with a structure providing access to the roof.
- Installation of a stainless steel extraction pipe for dust extraction.
- Installation of stainless steel piping with fully controlled valves.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Installation of automatic valves that open and close during the filling process.
- Realization of a platform that was suspended from an existing structure.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Installation of a complex cluster of stainless steel tube connections.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.