Check out these projects too
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Installation of a stainless steel extraction pipe for dust extraction.
- Stainless steel piping installed for product transport.
- Construction of a stainless steel fitting, made fully food-safe.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Realization of a laboratory space constructed from sandwich panels.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Installation of a complex cluster of stainless steel tube connections.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Installation of a compressed air collector in galvanized steel.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Project documentation of a renovation, with a before and after view of the building.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Execution of floor works in which the floor was adjusted and extended from below.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Realization of a fully finished washing room with sliding panel at the front.
- Installation of a spiral duct for extraction via the roof.
- Design and production of custom-made stainless steel dump hoppers.
- Modification and optimization of existing stainless steel pipes.
- A fixed panel was replaced with a hinged panel for improved accessibility.