Check out these projects too
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Installation of stainless steel piping with fully controlled valves.
- Execution of floor works in which the floor was adjusted and extended from below.
- Design and production of custom-made stainless steel dump hoppers.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Installation of a spiral duct for extraction via the roof.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Stainless steel piping installed for product transport.
- Installation of internal walls to create separate office spaces.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Construction of a platform to support a heat curtain and drying unit.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.