Check out these projects too
- Installation of a compressed air collector in galvanized steel.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Construction of a stainless steel fitting, made fully food-safe.
- Realization of a fully finished washing room with sliding panel at the front.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Realization of a platform that was suspended from an existing structure.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Stainless steel piping installed for product transport.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Installation of automatic valves that open and close during the filling process.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Installation of internal walls to create separate office spaces.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Construction of a preparation room with a structure providing access to the roof.
- Modification and optimization of existing stainless steel pipes.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Construction of a platform to support a heat curtain and drying unit.