Check out these projects too
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Installation of a compressed air collector in galvanized steel.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Execution of floor works in which the floor was adjusted and extended from below.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Construction of a preparation room with a structure providing access to the roof.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Modification and optimization of existing stainless steel pipes.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Installation of stainless steel piping with fully controlled valves.
- Installation of a stainless steel extraction pipe for dust extraction.
- Design and installation of a bridge structure above a moving can conveyor line.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Installation of automatic valves that open and close during the filling process.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Stainless steel piping installed for product transport.