Check out these projects too
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Realization of a platform that was suspended from an existing structure.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Realization of a laboratory space constructed from sandwich panels.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Installation of stainless steel piping with fully controlled valves.
- Installation of a stainless steel extraction pipe for dust extraction.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Modification and optimization of existing stainless steel pipes.
- Installation of a compressed air collector in galvanized steel.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Installation of a spiral duct for extraction via the roof.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Execution of floor works in which the floor was adjusted and extended from below.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Design and installation of a bridge structure above a moving can conveyor line.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Construction of a preparation room with a structure providing access to the roof.
- Construction of a stainless steel fitting, made fully food-safe.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Installation of automatic valves that open and close during the filling process.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.