Check out these projects too
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Installation of stainless steel piping with fully controlled valves.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Execution of floor works in which the floor was adjusted and extended from below.
- Installation of a stainless steel extraction pipe for dust extraction.
- Stainless steel piping installed for product transport.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Installation of automatic valves that open and close during the filling process.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Design and production of custom-made stainless steel dump hoppers.
- Installation of a spiral duct for extraction via the roof.
- Realization of a laboratory space constructed from sandwich panels.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Construction of a preparation room with a structure providing access to the roof.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.