Check out these projects too
- Project documentation of a renovation, with a before and after view of the building.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Construction of a wall that separates spaces and is provided with windows and doors.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Installation of a compressed air collector in galvanized steel.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Installation of stainless steel piping with fully controlled valves.
- Installation of automatic valves that open and close during the filling process.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Realization of a laboratory space constructed from sandwich panels.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Installation of a complex cluster of stainless steel tube connections.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Design and production of custom-made stainless steel dump hoppers.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Stainless steel piping installed for product transport.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.