Check out these projects too
- Installation of internal walls to create separate office spaces.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Modification and optimization of existing stainless steel pipes.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Realization of a platform that was suspended from an existing structure.
- Execution of floor works in which the floor was adjusted and extended from below.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Installation of a compressed air collector in galvanized steel.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Construction of a preparation room with a structure providing access to the roof.
- Design and installation of a bridge structure above a moving can conveyor line.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Realization of a fully finished washing room with sliding panel at the front.
- Realization of a laboratory space constructed from sandwich panels.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Installation of stainless steel piping with fully controlled valves.
- Installation of a spiral duct for extraction via the roof.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Installation of a stainless steel extraction pipe for dust extraction.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.