Check out these projects too
- Project documentation of a renovation, with a before and after view of the building.
- Design and production of custom-made stainless steel dump hoppers.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Construction of a platform to support a heat curtain and drying unit.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Installation of a complex cluster of stainless steel tube connections.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Installation of automatic valves that open and close during the filling process.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Realization of a fully finished washing room with sliding panel at the front.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Realization of a laboratory space constructed from sandwich panels.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Stainless steel piping installed for product transport.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Modification and optimization of existing stainless steel pipes.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Installation of a spiral duct for extraction via the roof.