Check out these projects too
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Installation of internal walls to create separate office spaces.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Installation of stainless steel piping with fully controlled valves.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Installation of a complex cluster of stainless steel tube connections.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Installation of a compressed air collector in galvanized steel.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Installation of a spiral duct for extraction via the roof.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Realization of a fully finished washing room with sliding panel at the front.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Installation of a stainless steel extraction pipe for dust extraction.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Modification and optimization of existing stainless steel pipes.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.