- Construction of a platform to support a heat curtain and drying unit.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Installation of a stainless steel extraction pipe for dust extraction.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Installation of a compressed air collector in galvanized steel.
- Stainless steel piping installed for product transport.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Realization of a platform that was suspended from an existing structure.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Realization of a fully finished washing room with sliding panel at the front.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Installation of automatic valves that open and close during the filling process.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Modification and optimization of existing stainless steel pipes.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Installation of a spiral duct for extraction via the roof.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Installation of stainless steel piping with fully controlled valves.
- Project documentation of a renovation, with a before and after view of the building.