Check out these projects too
- Installation of a spiral duct for extraction via the roof.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Project documentation of a renovation, with a before and after view of the building.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Construction of a preparation room with a structure providing access to the roof.
- Realization of a laboratory space constructed from sandwich panels.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Design and installation of a bridge structure above a moving can conveyor line.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Construction of a platform to support a heat curtain and drying unit.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Execution of floor works in which the floor was adjusted and extended from below.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Installation of stainless steel piping with fully controlled valves.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Construction of a stainless steel fitting, made fully food-safe.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Installation of internal walls to create separate office spaces.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Installation of a complex cluster of stainless steel tube connections.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.