Check out these projects too
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Installation of a stainless steel extraction pipe for dust extraction.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Construction of a preparation room with a structure providing access to the roof.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Installation of stainless steel piping with fully controlled valves.
- Modification and optimization of existing stainless steel pipes.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Construction of a stainless steel fitting, made fully food-safe.
- Realization of a laboratory space constructed from sandwich panels.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Installation of a spiral duct for extraction via the roof.
- Stainless steel piping installed for product transport.
- Installation of a compressed air collector in galvanized steel.
- Execution of floor works in which the floor was adjusted and extended from below.
- Installation of internal walls to create separate office spaces.
- Installation of a complex cluster of stainless steel tube connections.
- Construction of a platform to support a heat curtain and drying unit.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.