Check out these projects too
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Construction of a platform to support a heat curtain and drying unit.
- Installation of a complex cluster of stainless steel tube connections.
- Realization of a platform that was suspended from an existing structure.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Realization of a laboratory space constructed from sandwich panels.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Realization of a fully finished washing room with sliding panel at the front.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Project documentation of a renovation, with a before and after view of the building.
- Installation of a stainless steel extraction pipe for dust extraction.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Modification and optimization of existing stainless steel pipes.
- Construction of a preparation room with a structure providing access to the roof.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Execution of floor works in which the floor was adjusted and extended from below.
- Construction of a stainless steel fitting, made fully food-safe.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Installation of stainless steel piping with fully controlled valves.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Design and production of custom-made stainless steel dump hoppers.