- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Installation of a spiral duct for extraction via the roof.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Installation of a compressed air collector in galvanized steel.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Project documentation of a renovation, with a before and after view of the building.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Design and production of custom-made stainless steel dump hoppers.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Installation of internal walls to create separate office spaces.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Modification and optimization of existing stainless steel pipes.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Installation of automatic valves that open and close during the filling process.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Realization of a platform that was suspended from an existing structure.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.