Check out these projects too
- Construction of a wall that separates spaces and is provided with windows and doors.
- Construction of a preparation room with a structure providing access to the roof.
- Project documentation of a renovation, with a before and after view of the building.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Realization of a platform that was suspended from an existing structure.
- Installation of a spiral duct for extraction via the roof.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Modification and optimization of existing stainless steel pipes.
- Execution of floor works in which the floor was adjusted and extended from below.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Installation of automatic valves that open and close during the filling process.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Installation of internal walls to create separate office spaces.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Design and production of custom-made stainless steel dump hoppers.
- Installation of stainless steel piping with fully controlled valves.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Installation of a compressed air collector in galvanized steel.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Realization of a fully finished washing room with sliding panel at the front.
- Construction of a platform to support a heat curtain and drying unit.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.