Check out these projects too
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Construction of a preparation room with a structure providing access to the roof.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Installation of a compressed air collector in galvanized steel.
- Modification and optimization of existing stainless steel pipes.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Installation of a complex cluster of stainless steel tube connections.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Execution of floor works in which the floor was adjusted and extended from below.
- Construction of a stainless steel fitting, made fully food-safe.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Design and installation of a bridge structure above a moving can conveyor line.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Stainless steel piping installed for product transport.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Design and production of custom-made stainless steel dump hoppers.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Project documentation of a renovation, with a before and after view of the building.