- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Installation of a compressed air collector in galvanized steel.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Design and installation of a bridge structure above a moving can conveyor line.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Project documentation of a renovation, with a before and after view of the building.
- Installation of automatic valves that open and close during the filling process.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Construction of a stainless steel fitting, made fully food-safe.
- Execution of floor works in which the floor was adjusted and extended from below.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Installation of stainless steel piping with fully controlled valves.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Installation of a spiral duct for extraction via the roof.
- Stainless steel piping installed for product transport.
- Installation of a complex cluster of stainless steel tube connections.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Design and production of custom-made stainless steel dump hoppers.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Realization of a laboratory space constructed from sandwich panels.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Installation of a stainless steel extraction pipe for dust extraction.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.