Check out these projects too
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Design and production of custom-made stainless steel dump hoppers.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Realization of a platform that was suspended from an existing structure.
- Stainless steel piping installed for product transport.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Installation of internal walls to create separate office spaces.
- Installation of stainless steel piping with fully controlled valves.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Design and installation of a bridge structure above a moving can conveyor line.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Construction of a platform to support a heat curtain and drying unit.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Execution of floor works in which the floor was adjusted and extended from below.
- Construction of a stainless steel fitting, made fully food-safe.
- Construction of a preparation room with a structure providing access to the roof.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Installation of a spiral duct for extraction via the roof.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Modification and optimization of existing stainless steel pipes.
- Installation of a compressed air collector in galvanized steel.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.