Check out these projects too
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Construction of a platform to support a heat curtain and drying unit.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Stainless steel piping installed for product transport.
- Construction of a preparation room with a structure providing access to the roof.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Installation of a compressed air collector in galvanized steel.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Installation of internal walls to create separate office spaces.
- Construction of a stainless steel fitting, made fully food-safe.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Installation of a stainless steel extraction pipe for dust extraction.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Project documentation of a renovation, with a before and after view of the building.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Execution of floor works in which the floor was adjusted and extended from below.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Installation of a complex cluster of stainless steel tube connections.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.