Check out these projects too
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Construction of a platform to support a heat curtain and drying unit.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Installation of internal walls to create separate office spaces.
- Realization of a laboratory space constructed from sandwich panels.
- Installation of a compressed air collector in galvanized steel.
- Construction of a stainless steel fitting, made fully food-safe.
- Project documentation of a renovation, with a before and after view of the building.
- Design and installation of a bridge structure above a moving can conveyor line.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Installation of a stainless steel extraction pipe for dust extraction.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Installation of automatic valves that open and close during the filling process.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Installation of stainless steel piping with fully controlled valves.