Check out these projects too
- Realization of a platform that was suspended from an existing structure.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Stainless steel piping installed for product transport.
- Design and production of custom-made stainless steel dump hoppers.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Construction of a stainless steel fitting, made fully food-safe.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Construction of a preparation room with a structure providing access to the roof.
- Installation of internal walls to create separate office spaces.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Realization of a fully finished washing room with sliding panel at the front.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Installation of a compressed air collector in galvanized steel.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Execution of floor works in which the floor was adjusted and extended from below.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Installation of a stainless steel extraction pipe for dust extraction.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Installation of stainless steel piping with fully controlled valves.
- Project documentation of a renovation, with a before and after view of the building.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Installation of stainless steel pipes at a height of approximately 25 meters.