Check out these projects too
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Installation of stainless steel piping with fully controlled valves.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Execution of floor works in which the floor was adjusted and extended from below.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Installation of a complex cluster of stainless steel tube connections.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Installation of automatic valves that open and close during the filling process.
- Installation of internal walls to create separate office spaces.
- Construction of a platform to support a heat curtain and drying unit.
- Project documentation of a renovation, with a before and after view of the building.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Construction of a preparation room with a structure providing access to the roof.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Realization of a fully finished washing room with sliding panel at the front.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Design and installation of a bridge structure above a moving can conveyor line.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Installation of a compressed air collector in galvanized steel.
- Design and production of custom-made stainless steel dump hoppers.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.