Check out these projects too
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Construction of a preparation room with a structure providing access to the roof.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Design and production of custom-made stainless steel dump hoppers.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Installation of a complex cluster of stainless steel tube connections.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Installation of internal walls to create separate office spaces.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Stainless steel piping installed for product transport.
- Modification and optimization of existing stainless steel pipes.
- Installation of a spiral duct for extraction via the roof.
- Installation of automatic valves that open and close during the filling process.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Installation of a stainless steel extraction pipe for dust extraction.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Realization of a laboratory space constructed from sandwich panels.